in2Dredging, Simon Burgmans Getting to Know Adi Fadil: From Coastal Engineering to Dredging Consultancy Adi Fadil joined in2Dredging (i2D) in March 2025, bringing extensive experience across coastal engineering, port development, dredging and reclamation. Before joining i2D, Adi worked on both sides of ... 2 Sept 2026
in2Dredging, Simon Burgmans Sharing Ideas and Insights at PIANC APAC 2026 It was great to be part of PIANC APAC 2026 in Brisbane last week. The three-day conference brought the in2Dredging team together with industry professionals from across Australia and the Asia-Pacific ... 31 Aug 2026
in2Dredging, Simon Burgmans in2Dredging Heads to Dredging in India 2026 in2Dredging (i2D) is pleased to be attending the 17th Annual Dredging in India Conference, taking place on 9 – 10 September 2026 at the Courtyard by Marriott Mumbai International Airport. Connecting w... 19 Aug 2026
in2Dredging, Simon Burgmans in2Dredging at PIANC APAC 2026 in2Dredging (i2D) is pleased to be attending the PIANC Asia Pacific Conference 2026, taking place from 25 – 27 August 2026 at the Brisbane Convention Exhibition Centre. Connecting andSharing at PIANC ... 17 Aug 2026
in2Dredging, Simon Burgmans 3 Weeks to Go: Contractual Awareness Masterclass – 1 September Only three weeks to go until in2Dredging’s Contractual Awareness Masterclass on 1 September. Registrations close 21 August 2026, so secure your place today. If you work in dredging or marine construct... 12 Aug 2026
in2Dredging, Simon Burgmans Last Chance to Register for the Pumps 'n Pipeline Masterclass: 12 – 13 August 2026 Registrations are closing soon. If you work in dredging, mining, tailings, slurry transport or hydraulic engineering, this is your final opportunity to join in2Dredging's Pumps 'n Pipeline Masterclass... 4 Aug 2026
in2Dredging, Simon Burgmans Return Water Quality (RWQ) Modelling for Dredging Projects: Avoid Costly Surprises Return Water Quality (RWQ) modelling is an essential component of dredging project planning for hydraulic dredging projects involving onshore placement. Accurate Return Water Quality (RWQ) modelling h... 29 July 2026
in2Dredging, Simon Burgmans Dredging Contracts Masterclass: Avoid Claims and Disputes Poorly managed dredging contracts can quickly lead to costly claims, disputes and project delays. The Contractual Awareness Masterclass provides practical guidance on dredging contract management, con... 22 July 2026
in2Dredging, Simon Burgmans Reminder: Join the Pumps ‘n Pipeline (PnP) Masterclass | 12-13 August 2026 The countdown is on! If you work with dredging, mining or any hydraulic transport system, now is the time to register for the Pumps ‘n Pipeline (PnP)Masterclass, taking place on 12-13 August 2026. Onl... 14 July 2026
in2Dredging, Simon Burgmans FY2025/26 Project Highlights: Supporting Landmark Marine Infrastructure Projects Over the past financial year, in2Dredging (i2D) has continued to contribute to major marine infrastructure projects across Australia and internationally. From dredging engineering and dredging feasibi... 8 July 2026
in2Dredging, Simon Burgmans Hydraulic Fill Consolidation: Moving Beyond Bulking Factors The Hydraulic Fill Manual established the theoretical foundations of hydraulic fill consolidation. Yet bulking factors remain widely used to estimate hydraulic fill volumes. Discover how i2D’s Fill Co... 6 July 2026
in2Dredging, Simon Burgmans Why a Pump Curve Is Not a Design Envelope When discussing centrifugal pumps, the pump curve is often the starting point for selection and operation. It defines the relationship between flow and head, helping identify the expected operating po... 30 June 2026